When it comes to septic installation in Fairfield County and throughout Central Ohio, choosing an experienced excavation company is essential. At Eccard Excavating, we specialize in both residential and commercial septic system installations, ensuring a smooth and efficient process from start to finish. Whether you’re building a new home, upgrading an existing system, or installing a commercial septic system, understanding the key steps can help you prepare for the project.
Step 1: Site Evaluation and Permitting
Before any excavation begins, a thorough site evaluation is necessary. This includes soil testing to determine the permeability of the ground, ensuring it can properly filter wastewater. Our team works closely with local health departments to obtain the necessary permits, ensuring compliance with Fairfield County and Central Ohio regulations.
Step 2: System Design and Planning
Based on the site evaluation results, we design a septic system tailored to your property’s needs. Factors such as the size of the household or commercial facility, soil conditions, and property layout influence the design. We focus on efficiency, longevity, and environmental safety to create a system that will perform optimally for years to come.
Step 3: Excavation and Tank Installation
Once the design is finalized and permits are secured, excavation begins. Our experienced crew uses state-of-the-art equipment to dig the necessary trenches and install the septic tank at the appropriate depth. Proper placement is critical to the system’s functionality and longevity. We ensure the tank is level and securely positioned to prevent shifting or settling over time.
Step 4: Drain Field Installation
The drain field (or leach field) is where wastewater is naturally filtered into the soil. This step requires precise excavation and placement of perforated pipes in gravel-lined trenches. The pipes allow wastewater to disperse evenly, preventing backups or pooling. Proper installation of the drain field is crucial to maintaining the health of the system.
Step 5: System Connection and Inspection
After installing the tank and drain field, the system is connected to the home or business. This involves running pipes from the building to the septic tank, ensuring secure and leak-free connections. Before finalizing the installation, we coordinate with local inspectors to ensure everything meets health and environmental regulations.
Step 6: Backfilling and Final Grading
Once the system passes inspection, we backfill the excavated areas with soil and complete final grading to ensure proper drainage around the installation site. This step helps prevent erosion and ensures a seamless appearance for your landscape.
Step 7: Ongoing Maintenance and Care
A properly installed septic system requires routine maintenance to function efficiently. Regular pumping, mindful water usage, and periodic inspections can extend the life of your system. At Eccard Excavating, we provide guidance on how to keep your septic system running smoothly for years to come.
For expert septic installation services in Fairfield County and across Central Ohio, trust Eccard Excavating. Contact us today to discuss your residential or commercial septic system needs!